CLICK ON ANY IMAGE IN A CLUSTER TO ACCESS ITS GALLERY, INDIVIDUAL MEMBERS OF WHICH CAN BE VIEWED FULL SIZE BY SCROLLING DOWN THEIR PAGES AND CHECKING BOXES AT BOTTOM RIGHT
Today Richard concentrated on plumbing in the sink and the dishwasher. First came the cream plastic piping.
Cutting through the concrete wall required the use of the core cutter. Here the plumber holds up the solid tube of breeze block that he has removed.
Next came the gleaming copper pipes. In the largest of this group, Richard points out the stop cock. Visible in these last two images is the temporary sink he has left for us to use during the past week.
This was later removed.
The slender copper tubing had required bending and cutting to shape and size.
In mid-afternoon we left Richard on his own again to drive to Elizabeth’s where Danni and Andy are to cook a curry. If there is anything of moment I will report on it tomorrow.